LNG product loading jetty – Darwin, Australia

Design and construction of two separate vessel load-out berths, one for LNG carriers and a second for LPG/Condensate carriers.

A Y-shaped approach jetty consisting of a 680-metres leg connecting to the LNG berth, and a second 630-metres leg, connecting to the LPG/Condensate berth, provide access from the onshore facility.

The Ichthys LNG Project will produce 8.4 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak.

The project was completed in April 2015.