Woodside LNG Jetty Berth No. 2 - Karratha, Australia

Printer-friendly version

Construction of a second LNG berth for the Woodside LNG Phase 5 expansion. A 170 m long 6-span approach trestle and a 27 x 40 m loading platform extend from the existing LNG jetty built by BAM in 1985.

 

‘To allow the loading of LNG tankers with a capacity of up to 145,000 m³’

 

Downloadable pdf project leaflet

   

Return to previous page