Jebel Ali Terminal 4, phase 1, 1b & 2 – Dubai, United Arab Emirates

Construction of 2,240 metres of quay wall, 2,240 metres of land side crane beam to accommodate 100-tonne STS cranes as well as a 440-metres long access bridge and a 2.6-kilometres causeway to link the new terminal being built on an island of reclaimed land to the main port. Included in the contract was the installation of all quay furniture, the land reclamation to create the 17 hectares of yard and access road.

Included in the contract was the installation of all quay furniture, the land reclamation directly behind the quay wall and the crane beam to support the ship to shore cranes. BAM International was assisted by BAM Contractors of Ireland. The works were designed by BAM’s engineering company BAM Infraconsult, URS and AECOM.

For this project, BAM set up its own diving division – a fully certified team of commercial divers to run three separate diving operations 24/7.

Contact

For more information about our activities in the area Middle East / Gulf States please contact BAM International head office in the Netherlands, our area office in Dubai, our branch office in Abu Dhabi, our branch office in Jordan, our branch office in Oman, our branch office in Qatar or our representative office in Egypt.